Product Features
WhiteGuard

WhiteGuard™Features

Private Development Preview · v2.0.0-alpha.1

Phase 2 Development Preview

  • This is a private development preview and is not for production use.
  • Manufacturer-specific procedures, OEM integrations, telemetry connections, and AI assessments are inactive until validated and approved.
  • WhiteGuard Phase 2 is not currently an Epson product, partnership, endorsement, approved manufacturer solution, or confirmed Epson API integration.
  • Future capability descriptions are development concepts, not active functionality.

Accountability. Evidence. Governance.

WhiteGuard™ Phase 2 turns white-ink maintenance into a daily, timestamped, review-ready habit — all on your device. The active foundation is inherited from WhiteGuard LITE; the Fleet, OEM, and AI capabilities below are planned or gated for this Phase 2 build.

Active Foundation

Today

Know exactly what's due — and prove you did it

ACTIVE FOUNDATION
  • Daily priorities surfaced in one progress view
  • Every check-in stamped with a real local timestamp
  • Explicit nozzle-check outcome (pass or needs attention) — no tap-to-skip
  • Streak tracking that rewards consistency, not volume
  • Print Session start/end with live timeline and startup nozzle check

Procedures

Governed guidance that respects equipment authority

ACTIVE FOUNDATION
  • Generic decision-and-accountability checklists, not universal recipes
  • Authority metadata: owner, source, revision date, approval status
  • Clear Generic Guidance Boundary on every generic procedure
  • Model-specific steps only with an approved, governed source

Schedule

See the full cadence — daily now, weekly & monthly ahead

ACTIVE FOUNDATION
  • Daily white-ink habit front and center
  • Visibility into weekly and monthly routines
  • Configurable reminder time and print weekdays
  • Review-ready summary builder from recorded evidence

Review & Escalate

Turn exceptions into an auditable trail

ACTIVE FOUNDATION
  • Exception flags and operator notes on every check-in
  • Escalation records with severity and status tracking
  • Review-ready summary builder from completion, exception & escalation evidence
  • Supervisor routing and scheduled delivery are a planned Phase 2 upgrade

Your Wins

Build the habit with safe milestones

ACTIVE FOUNDATION
  • Streaks that reward showing up daily
  • Quick, habit, and long-term achievement milestones
  • Verified nozzle-pass wins only from an explicit pass result
  • Never rewards cleaning-cycle volume or over-maintenance

Plan Ahead

Protect your printer through absence and relocation

ACTIVE FOUNDATION
  • Extended-absence and printer-relocation planning workflows
  • Activation blocked until all authority fields are present
  • Physical-action steps come only from your approved model-specific source
  • Return-to-service accountability checklist

Inspect Visual Evidence

Document nozzle checks and finished prints on-device

ACTIVE FOUNDATION
  • Camera capture for nozzle, DTF, and DTG inspections
  • Photo-quality assistance (brightness, contrast, readability) — not diagnosis
  • Structured observations separated into condition, factors, next approved check
  • Images and records stay on this device — never uploaded or synced

Resources

Reference topics governed by approved-source rules

ACTIVE FOUNDATION
  • Topics without an approved URL render as non-clickable references
  • Approved external links open clearly in a new tab
  • No misleading search links or placeholder anchors
  • Source-linked cards labeled honestly — never implied OEM approval

Install & Settings

Make WhiteGuard yours — on your home screen

ACTIVE FOUNDATION
  • Installable PWA with home-screen access
  • Top or bottom navigation placement — your choice
  • Reminder time, print weekdays, and on-device preferences
  • All data stored locally on this device

Planned Phase 2

Fleet & Multi-Site Management

Fleet/enterprise work is defined but not yet implemented

PLANNED PHASE 2
  • Multi-site, multi-printer oversight and reporting
  • Supervisor dashboards and workforce accountability
  • Aggregated escalation and review across deployments
  • Defined in Phase 2 requirements — not active in this preview

Gated / Inactive

Model-Specific Procedures & OEM Integration

Pending validation and approval — currently inactive

GATED / INACTIVE
  • Manufacturer-locked, model-specific procedure authority
  • OEM API and dealer integration paths
  • Telemetry connections to supported printers
  • Inactive until a validated, approved profile is documented

AI Assessment & Diagnostics

Inactive — requires an approved model profile

GATED / INACTIVE
  • Model-specific AI pass/fail and artwork-to-print comparison
  • Trend analysis and technician/OEM reports
  • Corrective-action routing from approved sources
  • Currently documents observations only — never infers pass/fail or diagnosis

What this preview does not do

WhiteGuard™ Phase 2 does not diagnose equipment, invent corrective actions, perform AI pass/fail, sync to the cloud, or guarantee closed-app push delivery. Model-specific AI assessment, artwork-to-print comparison, trend analysis, technician/OEM reports, OEM API integration, and telemetry require a supported, approved profile and are inactive in this preview. The inherited foundation is local-only and one-printer.